Tip:
Highlight text to annotate it
X
>> COOLER TODAY> THE TAPPAN
ZEE BRIDGE FREE AND CLEAR IN
BOTH DIRECTIONS. YOUR STATE
THRUWAY IS OK. I 287 EAST ON
THE ACCIDENT REMAINS ROUTE
121-BOX THERE. NO MAJOR
DELAYS. THE TOLL PLAS GOOD
SHAPâ– LOWER-LEVEL AND
PALISADES PCH
ACCEPTING EASY PASS ONLY
UNTIL 6:00 A.M.. BQE
UTHBOUN IOS
hMPLE. ALTNATE SIDE
>> YOU JERSEY TURNPIKE
POCE ACTIVITY IN THE AREA.
STPOLICE ARE SAYING
TRAFFIC IS SLOWING DOWN A
BIT.
BROOKLYN BATTERY TUNNEL
VERY QUIET. TRAINED SO
WIZENED BOSSES ARE ALL
RUNNING ON TIME
EVERYTHING IS
RUNNING ON TIME AS FAR AS
THE L.I. HE XI
FOR THE QUEENS MIDTOWN
TUNNEL FOR THEIR EAST ON
CONSTRUCTION ON THE
EASTBOUND SIDE TLANES
BLOCKED MINOR DELAYS. THE
BELT PARKWAY PAST JFK SAME
SITUATION LOOKING GOOD FROM
THE VERRAZANO INTO THE
SOUT
IT THE LOW
80S YOU JERSEY TURNPIKE
QUIET PAST NEWARK AIRPORT.
S.I. CROSSINGS ARE ALL IN
GOOD SHAPE. AS FAR AS THE
VERRAZANO OVERNIGHT
CONSTRUCTION AND ALLOW
LOCAL.
NEW JERSEY
TURNPIKE STATE POLICE ARE
TELLING US THERE IS A
SLOWDOWN TO THE AREA. AS FAR
AS THE BQE IS CONCERNED
TOUGH ON THE ROAD WITH STILL
REMAINS COMPLETELY CLOSED
DOWN. AS FAR AS I TO 87 IS
CONCERNED THE ACCIDENT
REMAINS. CONDITIONS INBOUND
AND OUTBOUND NO DELAYS FROM
THE PARKWAY MERGE INTO
HAMILTON AVE. THEN IT LOOKS
GOOD NORTH AND SOUTHBOUND.
THE E
PARKWAY INTO THE
MEADOWLANDS AS WITH COMMUTE.
LINCOLN TUNNEL INTO THE TOLL
PLAZA EVERYTHING IS RUNNING
SMOOTH. OVERNIGHT
CONSTRUCTION IN THE PROCESS
OF CLEARING.
TAPPAN ZEE BRIDGE IS
CLEAR. THESE BONDS I TO 87
AND EXIT HAS BEEN CLEARED.
NO DELAYS AS FAR AS THE
GEORGE WASHINGTON BRIDGE
EVERYTHING LOOKS GOOD HERE.
IF TRAVELING ON LOW-LEVEL
PALISADES PARKWAY APPROACH
LINCOLN AND HOLLAND
OVERNIGHT CONSTRUCTION WILL
CLEAR SHORTLY. NORTHBOUND
SIDE OF THE NEW YORK STATE
THRUWAY TO EXIT AND 84
AND TOMORROW
IS EVEN BETTER THAN TODAY IN
JERSEY TURNPIKE NORTHBOUND
SIDE POLICE ACTIVITYN THE
AREA OF 195 THE FDR DRIVE
THIS QUIET IN THE '20S NORTH
AND SOUTHBOUND. MIKI WENT
OUT TO THE BQE REP FOR THE
BROOKLYN BRIDGE NORTHBOUND
SOFT BOND TRAFFIC IS PRETTY
MUCH CLEAR WHAT WE HAVE
CURES CONSTRUCTION ON THE
BROOKLYN BRIDGE INTO
MANHATTAN. WEST SIDE HIGHWAY
ALIVE LOOK TO THE BATTERY
TUNNEL. METRO-NORTH NEW
JERSEY TRANSIT AL I DOUBLE
OUR YEAR
THIS AGAIN
IS LOOKING GREAT. ALREADY