Tip:
Highlight text to annotate it
X
Uniform flow concept will be required in our every step, I mean in most of the time we
will be designing the canal by seeing what will be the depth of flow.And in in deciding
those depths of flow, in computing those depths of flow, we will be definitely using the concept
of uniform flow. And in uniform flow, if we just recall, we studied about the resistance
flow formula and in that resistance flow formula we remember that we had resistance parameter,
that is say roughness coefficient we call it. So, in Manning’s equation, that is say
n value and in chassis equation, that can that is that was written as c, chassis coefficient,so
that way whatever may be the name, this particular roughness coefficient depend on the roughness
of that channel. So, now, when we are going for designing a channel, then this roughness
parameter is also very significant that we consider and then we design the canal or channel,
ok. So, these aspects will be coming there and
then we studied critical depth or critical flow condition.Of course, critical flow condition
will also be required in some part of the design, like that sometimes we may be,we wewe
may be willing to see that the flow is not supercritical, so that the canal will not
be damaged and in those situation, we will be requiring the critical flow concept in
design of the channel. Well, then of course, we studied gradually
varied flow and we studied rapidly varied flow. In fact, in canal design, normal canal
design, thisgradually varied flow and rapidly varied flow concept is not coming directly,
but suppose in a canal, we have a barrier upstream or barrier downstream rather than,
say there will besome gradually varied flowprofile forming.
And in that case, sayfor normal condition when we are designing a canal, suppose we
are getting a particular depth in it, now say we think that there may be some obstruction,
downstream and in that case some gradually varied flow profile can be forming and in
those situation what will be the additional height that is required over the computed
depth of uniform flow? And those things may be required and then similarly rapidly varied
flow also we may have to see, where the graduallywhere the hydraulic jump may be forming and say
concept of rapidly varied flow is also required in those situations. Suppose, we are narrowing
down the canal to a very small width, then sometimes we need to see whether there will
be afflux on the upstream, whether there will be a varying varied flow just near thatsay
constriction, so those aspect alsowe need to know.
Well, then, when we are talking about design of canal, then we should know that there may
be channel when we were discussing about classification of channel, we were mentioning about that
part, that is there can be natural channel or there can be artificial channel, well.Now,
natural channel is that we are getting in the nature, like river, stream, all those
things and in those cases, this concept of canal design or channel design might be coming
in some of the issues where, we are designing some hydraulic structure and then there may
be some approach channel which is otherwise natural, but we need to maintain some of the
conditions, there sayit should not be degraded more, that mean there should not be erosion
or there should not be say deposition, that sort of condition may come up and in those
situation,we will be requiringthis concept of canal design inthose part.
But in manmade canal, particularly when it is artificial channel, then that means it
is a manmade canal, when we are talking about artificial channel,well.That manmade canal
that everything depends on how we design the canal and that that is why for artificial
channel, this or say artificial channel means we call this as an irrigation canal or say
drainage channel. Those are artificial channel and for those situation, the concept of designing
channel will be coming in a more, I mean is more required in those cases.
So, let us start with say design of canal and we want to specify at the beginning that
canal can be broadly classified into two group, well, again there can be subclasses, but broadly
we can classify canal into two group.Say, one is Lined canal like this one, that we
are showing here say this is a Lined canal, there are lining, we did discuss about this
sort of canal in our very first class itself. So, this sort of canal when we design, then
our design concept will bedifferent from that, when we design a channel for a unlined situation,
means like that channel or we are showing in theslide here, you canconcentrate on to
the slide. So, the canal can be lined canal or it can
be unlined canal. Now, when it is lined canal then we call this as a rigid boundary canal,
so it is a rigid boundary canal. Now, by lined or by the term lined canal what we are meaning
is that, this canal when we are constructing, we are providing some lining to the boundary
of the canal. Means to the side, say if the canal is there to the side we are providing
some wall and to the bottom also we are providing some wall.Now, those walls can be concrete
wall or sometimes we may decide to provide a say wooden boundary also in some cases and
in hilly area I have seen that some people are providing bamboo lining also. So that
wayin some cases some experimental situation we may provide, sayplastic also like that,
so different type of canal alignment can be there and for if we are trying to carry some
very important item, then it can be steel lining also.
Well, so like that canal lining can be of different type and when we are providing those
lining we are referring thisas a lined canal, well, but another point here we should know
that by line canal ourobjective or design concept is coming like that, that this canal
will not be eroded by the flowing water. So, that we are completely avoiding in our thinking
of design, that this canal is never going to be eroded and so other requirement will
be deciding in the canal design. So, now, suppose a canal it may not be lined,
but suppose it is passing through a very rocky tarring and somehow we aremaking a may be
rectangular or trapezoidal canal through a rocky tarring, then also there will not be
any possibility of getting eroded or there will be less possibility of getting eroded.
Becauseit is if it is a very hard rock,of course it will depend on the composition of
rock andhow much it is susceptible to water erosion or to weathering how much it is susceptible
to weatheringif it is exposed to water and if it is exposed to atmosphere in tropical
country. Particularly if those weathering conditions are different, but, however, in
general, when a canal is made on a rocky tarring, we may consider these to bea type that it
will never be eroded and in that process the concept of line canal will be applicable although
we are not providing an artificial lining to such canal.
Well, then when we are talking about this unlined canal, means we are talking about
mobile boundary canal or mobile boundary channel.By mobile boundary what we mean that the channel
bed and the side can get eroded, well it can get eroded. Now, when we talk aboutthissituationthat
it can get eroded, that means it will depends on various parameter, like what is the flow
velocity, how much can be the erosion, what is a type of sediment that is thethe bed is
constituted of and so the bank is. So, that way the type of sediment and the saturation
condition all this different aspect will be coming.
Well and again depending on that, particularly depending on the formation through which the
canal is passing, suppose sometimes it may be a alluvial formation, right, say alluvial
formation means a the bed material are say silt, sand, it is like that and in that case
it may be more susceptible to erosion.Again, in some case, the canal may be passing through
non-alluvial formation, means say clay formation and in that case, the susceptibility of that
to erosion may be less, but again it depends on suppose in upstream there are something
because of which the canal can carry or the water flowing through the canal can carry
sediment.Then we need to see that this sediment should not get deposited into the canal and
the path may not be blocked, so all those issues will be coming.Well, with this understanding
then we can have one idea right now, that well as the canal can be of different type,
the design concept for these different types of canal will of course be different. Well,
so let us see what can be the design concept of lined channel, what can be the design concept
of a lined canal?
So, first let us talk about rigid boundary canal, meanswhich is not mobile, boundary
is rigid means it is a lined canal. Well, so first point that canal design, what we
mean by canal design that of course we need to know.That the canal needs to be designed
to carry a given amount of discharge,first, from other criteria we should know that what
our requirement is.And what is our requirement means, the basic requirement of a canal is
that it should carry this much of discharge that is the volume of water that needs to
carry. So, we need to design this to carry that sort of discharge.Now, when we are saying
that we are designing, means what we are basically doing?Well, so discharge is given and then
Slope of the channel, say when we say that this is our design canal, means what we need
to give? We need to saythis is the bed width of the channel that need to be provided, this
is the depth of the canal that need to beprovided and of course, we can say that this is the
Shape, it can be rectangular, it can be say trapezoidal, it can be triangular, it can
be circular, so different type of Shape we may suggest.
So, that way our design may involve all those things and then we can suggest, well, this
canal will have to have a slope of this much. But, now, when we talk about the Slope, then
we can see that slope of a channel, you can concentrate on the slide, the slope of the
channel depends on the topography, well, that means, that slope we have hardly much scope
toplay with that particular parameter. Say, we need to design a canal in a particular
locality or in a particular location to carry discharge from one point to another, then
the natural slope or natural topography will guide that what should bethese slope, there
we can play by a very small amount.Say for example, if I draw this one, say this is the
canal and natural topography is suppose like this and then, we may not design a canal like
this and then that and in this way, but we can design a canal by filling up some portion
here, then cutting some portion here and then filling up, we can design a channel of uniform
slope. So, I mean the marginally we can change the
existing natural slope and we can haveour desired slope to some extent, but it is not
that we can change the slope grossly, well. So, generally when we talk about design of
canal, we do not think or we do not consider that we have enough opportunity to manipulate
with the slope. So, we will assume that this is the slope or we will take the natural slope
as our slope and thenwe will go or we will proceed for the design.
Well, then another important point that we were discussing that is the roughness coefficient
depends on the lining material or the roughness of the rigid boundary. So, we need to see
that what sort oflining we are providing and based on that we will be deciding that, well
this is our roughness coefficient n.And in some case, well if we are thinking that by
providing a particular type of lining oursay roughness coefficient decreases and we know
that when our Roughness coefficient decreases, then our discharge capacity or discharge carrying
capacity of the channel will increase, because Q is equal to 1 by n, then it is coming that
a then R to the power 2 by 3, S B to the power half.
So, if we remember that formula 1 by n is there, so if we if if the n value reduces,
then thus carrying capacity of that channel increases. So, in some cases, we may have
to change the lining also, in fact, for improving the channelcarrying capacity many a time thisside
slope or the I mean slope of the canal, the side of the canal and bed are many a time
lined with some finer lining so that we can have better flow through that.
Well, then another aspect is the shape of the channel that depends on various constraint,
well, that is of course, I am not writing in a very very elaborately, that it depends
on various constraint, now what can be those various constraint, shape of the cannel.Sayfor
some situation we will have to go for trapezoidal channel, why, say if we go for rectangular
channel, if we go for rectangular channel, then suppose the channel depth coming is quite
significantly high. And if we make a vertical cut in a particular
formation, then that side or the vertical cut may not stand,it there may be slope failure,
there may be the failure of the side and so that waythis sort of channels when there is
a vertical cut, I mean when vertical cut is not possible, we need to go for inclined cut
or indirectly this lead to trapezoidal channel.Well, then similarly sometimes we may find that
a triangular shape is suppose better, for some consideration say triangular shape is
better, but when it is a triangular shape, then we can see thatwell.
When it is triangular shape, then we can seethat thus I need to take the pen, well, say this
channel, suppose triangular channel is otherwise better, but we can find that this angle a
may be sometimes is very narrow and say if sediment deposition take place in this part,
it may be practically difficult to clean those things and that may be one constraint. So,
I am just giving one constraint, but there may be several such practical constraints
and sometimes say we feelcircular canal is better, circular canal if we construct it
is mosteconomic or say it is better. But construction of circular canal itself may have lot of practical
difficulties, say we are trying to construct in a very interior place and the frame work
that is required for constructing a circular canal may not be available there, the labor
available or the manpower available rathermay not be that may not be having that expertise
to make a circular canal. So, that way there may be differentdifferent
situation which force us to take a particular shape. And as I was already telling that rectangular
channel if we take, suppose this sort of cutting is there and then if this is supposesandy
soil, it will not stand, this will fail.And then if it comes here, if it fails and if
it comes here this sediment will block the flow and it will create problem.
And say we are giving lining, then of course the failure chance is less, but to prevent
the failure the cost of lining that is required may be much high, rather than that if we give
a inclined shape then easily it is otherwise also stable. So, lining is not required to
support the soil, but support the soil means support thecollapse of soil, erosion, resistant
for that purpose we require it, but for to prevent the failure of slope, the thickness
of the side is not required. So, this thickness will be less and that way it may be preferred.
So, depending on various constraints we need to decide the shape of the channel, in some
cases people are trying with channel of this sort, say this part is circular and then this
part is expanding, because this part has cleaning provision and that is why it may be advantageous.
So, in some channel, we can go for that sort of shape also, well, so based on all those
experience and understanding and the real situationthen we need to decide that what
will be the shape of the channel, well. So, once we have the Shape of the channel and
at the shape of the channel we must mention another point, that is the slope, that slopes
well we are saying that it is trapezoidal. Now, depending on the different type of soil
the slope of this trapezoidal channel may be this theta, may change.
Well, then, if all these things are there, say we have the discharge, we now know the
roughness coefficient, we have decided that our channel should be trapezoidal or rectangular,
whatever it is, which is most advantageous and that we will decide.And thenwe are having
the slope of the topography also, so after having all these things in our hand our target
will be to design the canal, so that we can achieve the highest economy that is the most
economic section we need to design. So, ourchannel should be such that it cost
is its cost is lessand so that sort of channel when we designthis is the very basic concept
when we follow, then the channel shape whatever we get, we call that as a most economic section
and that particular section, most economic section is also called hydraulically efficient
section or we call best hydraulic section. Well, so that wayin case of design of line
canal, in case of design of line canal our objective is to design the canal as a most
economic section or the best hydraulic section, these are actually just the same name and
or efficient section, right, different names we follow. But, herewe can have some relation,
most economic means say if we are providing lining, if we are providing lining to the
canal, then our target, if we try to reduce our cost then our target will be that, well
our perimeter, because lining means the lining we are providing in the perimeter, this here
we are providing the lining. So, if we try to reduce the cost, if we try to reduce the
cost, thenthis length perimeter should be minimum, so that way we are talking this as
a most economic section, but now what is the difference between best hydraulic section
or efficient section? You see Most economic section is coming because the cost is less,
now again if we see, suppose the same area, same area is there and then to minimize the
cost we are trying to reduce the length of the perimeter, but in that process we are
achieving another objective. See, the resistance to the flow is coming
from the perimeter, if our length of the perimeter is more, resistance to the flow will also
be more and when resistance to the flow is more, suppose for the same area if the cross-sectional
area is remaining same, cross-sectional area remaining same. If the perimeter is large,
then that is weighted perimeter is large, then resistance will be more and as such the
discharge will be less and our objective will always be to carry the maximum discharge or
say require discharge at minimum perimeter provided area is remaining same.
If we talk about excavation, say excavation will depend on the area, sectional area I
am talking about, this is total volume but length is something and with that length and
this area if we cut the channel then excavation is coming up, then excavation will depend
also on this section of the area. If the the volume of excavation will be that this sectional
area multiplied by the length, now, if this area remain a fix, then this excavation a
into L that volume will remain same and as such the cost of excavation will remain same.Now,
for the same area, if we can have minimum perimeter, then we are always on the beneficial
side. From the economic point of view that is the cost of lining and from the flow point
of view or hydraulics point of view that is the discharge point of view,the for a same
area discharge carrying will be more if perimeter is less. So, that is whywe design the canal
with this particular concept that is the most economic section or best hydraulic section
or efficient section.
Well, now, but always it may not be possible.Say, now, what will make this best hydraulic section
that we will discuss definitely, but it may not always be possible to design the channel
or canal as a best hydraulic section. Suppose, for a rectangular channel, if I say that best
hydraulic section is that where say bed width is equal to say twice that of the depth, well
we will derive that later on, but right now you justtake it or let us take it in that
way, that suppose we know that for a best hydraulic section the bed width should be
twice that of the depth. Now, well, by that concept to carry a particular
discharge, we can havethis is the section.Now, we have a slope, there the bed slope, now
what is the other constraint that may come, first is that need of having minimum permissible
velocity, you can concentrate into the slide that is need of havingminimum permissible
velocity. Well, what is mean by that?Well, the canal,
when it is lined we know that it will not be eroded, so we are not worried about that,
it will not be eroded, so how much velocity is flowing or what is the velocity of flow,
we are not that much worried of course, thereis always a maximum permissible limit also. But,
still say we are less worried about that part, but we are more worried when suppose we are
designing a canal and we know that this canal there may be sediment laid in water flowing
through the canal, that is water is carrying some sediment from upstream.
So, in many many cases, we find that in a city suppose we are designing a canal and
that canal portion may be a lined canal, but in the catchment, say upstream area, there
may be lot ofhills or there may besayvegetation cover may not be there in the catchment area
and because of the during rain suppose lot of sediment may come. So, although our canal
is a line canal, but it is carrying sediment laid in water, it is carrying sediment laid
in water.And now, if the flow velocity in the canal become very less, than the sediment
carried by the water may start settling down in the canal.
And as we know that say this is our canal and from the upstream say a lot of sediments
are coming and then sediments are settling down, because the flow velocity is less and
for a water its sediment carrying capacity depends on the flow velocity.Well, if it its
velocity is high, it can be carry more sediment. Suppose the water are coming from the upstream
catchment or the upper catchment where it is coming from a hill on that way, suppose
the slope is very high there and the flow velocity is very high, it is eroding the soil
and then it is coming and entering the city and in the city, it is finding a drainage
canal where the flow is moving, but that flow is carrying lot of sediment that it has carried
from upstream. And once it is in the city, it may be a plain
area and if it is a plain area,of course in the city if it is hill that is fine, velocity
may be high, but if it is a plain area, then if the velocity drop down, velocity drops
below a particular limit, then depending on the size of the sediment it may start settling
there.And if it settles thenthus carrying capacity of the canal will be reduce, say
originally its sectional area was entire sectional area with time, when sediment will start settlingthere,
then its carrying capacity will be reduced grossly and then the objective for which the
canal was designed will not be served. So, that way we need to take care that when we
are designing a channel, suppose we have done our calculation, we have put the best hydraulic
section, then what we need to see that for required discharge, with what velocity the
water will be flowing in the best hydraulic section.
Now, in the best hydraulic section, suppose we are finding that with the velocity with
which the water is flowing is not sufficient to carry the sediment that it is carrying
with it, then definitely we cannot provide the best hydraulic section, because at that
point our criteria changes.Well, we tried with best hydraulic section, but it cannot
be provided because the water will not be able to carry the sediment and sediment deposition
may take place, that will create problem. In fact, inin ain area,in in in a city, I
was involved in a drainage design and I could see thatthis canal, the existing canal could
not serve, because say total depth is 1.5 meter, but this depth of sediment that was
observed is point 5 meter. So, originally it was designed for 1.5 meter
of depth, but thisexisting depth is only one meter. So, that way this lead toflash flood
a sort of thing, that is the canal cannot carry the required drainage and then we have
to see that how it can be, I mean overcome, how this problem can be overcome, so this
design was wrong actually. So, so that sort of concept we need to see.Then another point
that Constraints of not exceeding maximum permissible velocity this is also one point,of
course in line canal, if our lining arestrong enough then we can go for high velocity.Again,
in some cases, we can go up to 3 meter per second, four meter per second that sort of
velocity is also permissible, but if our lining is not that strong enough, say due to economic
reason we cannot provide that strong lining and in that case, we will have to beworried
about that aspect also, that the velocity should not exceed a particular limit.
And so far this minimum velocity is concerned, it is generally found that .6 meter 2.9 meter
per second sort of things and on in an average generally .7 meter per second can be considered
thisminimum velocity so far is concerned. But maximum velocity we can go to say 4 meter,
5 meter depending on theI mean type of bank lining, but this is one consideration that
we need to make, then there may be some other constraints like constraints regarding width
of that canal. Well, recently I was involved in a design
aspect of one city called dibrugarh, there design of canal. And thenthere the drainage
canal this was found that with all calculations that how much discharge will be coming from
hydrological calculation, that I could see, that the size required for the canal is, say
I mean if I go for the best hydraulic section the width become say 4 meter, 5 meter like
that. In some places, now it is passing through some already developed area and roads are
there, so if we and we need to provide thecanal in those portions, because so far the surfaceterrain
condition is there, this is the place where the water will be coming, but nowthe road
size itself is notthat large there. So, the you forget about theside canal or the road
side canal, so there we may not be able to go for that type of canal which is say four
meter wide.Well, in that case, we may have to reduce the width and we may have to increase
the depth to carry that discharge. Of course, while doing those then we need
to see whether the flow velocity will be dropping down to a minimum value and whether this will
lead to sediment deposition.If so, whether a pumping device is required, all those aspect
will be coming.And of course, sometimes even we may think thatif this is not possible reducing
that part, we may have to make a canal, box canal, which over which the road may be there.
So, under the road we may have to have a box canal, so different options are there. Well,
but still that sort of constraint may be coming the width of the canal, length, availability
and all these things will be coming.And sometimes there is suppose constraintsagainst depth
of canal, well that is also another constraint. Suppose after calculating the best hydraulic
section, we have foundthat the width is 2 meter, depth is one point 5 meter, fine ,well,
we tried to put that, but we have seen that below one meter there is a sayvery important
object likesayoil pipelines, suppose which is carrying oil. And this cannot be removed,
this cannot be lowered at that point somehow and then you cannot provide a depth of 1.5
meter there, so you will have to restrict your width, depth.And similarly, supposein
a particular area we are trying to make a canal, which is of 2 meter depth and then
we have found that after 1.5 meter there is a rock strata, well.And then say it is an
irrigation canal and we cannot afford to afford to say cut that rock and tobecause it will
be quite expensive, so that way it may not be possible.
So, we may decide thatthis our best hydraulic section cannot be provided here, rather we
will go for a depth of say 1.5 meter, because at 1.5 meter depth the rock strata is there
and we cannot go below that. So, that way there may be different practical constraints
and that govern the size of the channel, but our effort, our basic design concept for line
canal is that we should try for designing it as best hydraulic section, which is the
Most economic section as well.
Well, then we will be discussing unlined canal in detail, but before going to the discussionlet
us discuss some of the issues briefly about unlined channel. Well,we will be discussing
that also in detail in different class, but still some of the very fundamentals or required
things we will be discussing here. When we talk about design concept of unlined channel,
entire concept is different, here we are not talking about best hydraulic section or rather
we can say that the most economic section is not the best hydraulic section here.
So, because the entire concept is different here, say there may be erosion or deposition,
well when it is a unlined canal, so with flow velocity there can be always erosion of the
bed and side bed and side can be eroded and once it is eroded at a particular point, then
it is obvious that the canal will be carrying sediment laid in water, once it is eroded,
it will be carried by the water. So, from upstream itself it can carry, within that
channel itself it can erode and it can erode side and bed and then it can carry the sediment.Once
it is carrying the sediment again the velocity is low at some point, it may again deposit
the sediment. So, what we can have that, this sort of channel we are very much concerned
about that erosion and deposition of sediment in that particular channel, well.
And if erosion occurs and if deposition occur, already we have discussed if deposition occur
then the entire carrying capacity decreases and similarly, it has of course far-reaching
effects, suppose that channel is of this type and somehow the flow velocity is dropping
down and deposition is taking place here.Now, when deposition takes place what happens?
Suppose the water was flowing with a particular velocity then when deposition is taking place,
flow velocity get retarded in the upstream and when it is retarded, because it is getting
some obstruction and it is retarded flow velocity,if it as it is says subcritical flow flowing
here. So, it is retarded, now when it is retarded
its sediment carrying capacity further drops down and then furtherdeposition take place.
So, that way ultimately the entire channel slope get reduced like that, when say Slope
is reducing, again depth is increasing, flow velocity is further decreasing and then sediment
deposition is further increasing, and that way it is a progressive process.Due to a progressive
process and that is why this is not desired at all, so we should design the channel in
a way that there should not be deposition of this kind, similarly, if it erode the channel,
then also we are not achieving our target.If it is eroding then it will cause damage to
the channel flow, if it is eroding the side, it can get widen.Suppose the channel is like
this, was like this and it has eroded this side and bed, then its entire section is changing
and we may not get the required depth what was desired and the flow velocity may again
change and then againit may sometimes lead to deposition initially erosion.
So, those erosion and deposition erosion will always cause damage to that channel and that
is why this erosion and deposition we should not allow or we should design our channel
in such a way that this can prevent erosion and deposition, which is not desired at all,
well.And that is why it is required to design a canal to carry the required discharge,discharge
is always say fixed, we are deciding that our channel is to carry this much of discharge.
So, this discharge safely, by safely what we are meaning that maintaining the required
dimension of the channel, maintaining the required dimension of the channel means it
should not get eroded, neither it there should be deposition, well. So, thus design principle
is to have a flow velocity, which will neither cause scouring, means that is erosion of the
bed, nor will allow sediment deposition, nor will allow sediment deposition, well in the
bed, this is what the design criteria. So, in ourdesign of line canal, the design
criteria was that it should be the best section, most economic section, but here our design
criteria is that,in line in in unlined canal the design criteria is that the velocity should
be such that there should not be any scouring or neither there should be any deposition
of course.In real situation, it may happen that the bed is having some erosion, because
the process of flow is like that, it may cause some erosion in the bed.And at the same time
it is eroding the water, is eroding some part of the soil and again deposition is taking
place in the next movementin that position suppose. So, erosion and deposition process
if it is going simultaneously, in that case, it will appear that the channel is neither
getting eroded, nor it is getting scoured, but in reality, both process may go parallel.
Well, in some of the design concept of unlined canal it is assumed like that, that we talk
about a critical velocity, that this is the critical velocity, wellthis critical velocity
is different from the critical flow concept, that we discussed earlier, that is the minimum
energy concept, it is not like that, but we talk about a critical velocity, it is like
that which is neither scouring nor depositing or we can say that it is scouring and depositing,
but both are in balance condition and that is why it is appeared to be neither scouring
and nor I mean depositing, so that sort of concept will be coming.
Again, when we are talking about unlined canal, thenthe canal that we are designing as unlined
it may pass through an alluvial formation or an non-alluvial formation. Well, when it
is passing through a non-alluvial formation, means a clay formation and like that, so that
sort of formation is less susceptible to erosion and in that case our major criteria are say
there should not be deposition or the velocity. Or rather one point is that this alluvial,
it is non-alluvial canal and then we can decide that if the velocity is not exceeding that
particular limit, which can cause erosion to this unlined canal, non-alluvial unlined
canal, that we should not cross that velocity. So, it is a maximum permissible velocity conceptwe
can follow, that this is the maximum permissible velocity, we should decide the shape and we
should design the shape in such a way that we achieve a velocity which is not crossing
the maximum permissible velocity.And at the same time the minimum permissible velocity
is also there which will not allow a deposition of sediment, but if it is passing through
a alluvial formation, if it is passing through a alluvial formation, in that case, we need
to go for that critical velocity concept, erosion and deposition both arevery muchimportant
there and relevant for the design purpose. And for that actually the theory developed
so far is not that much andmost of the things are empirical, that is based on the observedobservation
carried out in different canal, some formula has been derived, that is empirical relations
are there of course, semi-empirical theories has also been developed, that is semi-theoreticalwe
can call, well, that way different concept are applied for design of unlined canal.
Well, now, till now we are talking about one term that is most economic section. Well,
but what this most economic section is we have not discussed till now, we are giving
just one term that is the perimeter should be minimum, but why that we have explained.
But if perimeter is minimum, how we can achieve this, how we find that which will what condition
will lead to perimeter minimum.
So, let us see that concept of most economic section. Well, we discussed about a term called
conveyance, that is Q is equal to say 1 by n A R to the power 2 by 3 then S to the power
half.And when we designed canal, we are talking about normally uniform flow, we see that in
uniform flow condition what it is.And then of course, when we decide the side, we give
some excess height, that is called free board of the canal and that free board is given
generally it should not be less than 5 percent of the depth or it should not be more than
30 percent of the depth, it depends on some other criteria based on which we decide that
this should be the free board. So, from our design depth we give some excess
depth as free board, well, that will be coming, but normally we use uniform flow formula,
so this is what the formula.And here 1 by n A R to the power 2 by 3, that is basically
the conveyance k and when our conveyance is more, when our conveyance is more, that means,
it can carry more discharge, conveyance more means, literally it means that it can convey
more water. So, our target is to maximize theconveyance, maximize the conveyance.Now,
when this S B is fix, n is suppose we have decided from the other criteria as discussed,
then our target is to minimize this A R to the power 2 by 3 or now, we can write from
here say this is equal to 1 by n A, then A by P to the power 2 by 3 and S B to the power
half. Now, as we were talking about other criteria,
say area is fixed, means if our area is fixed for a particular lined, volume is fixed now.
So, when for that particular area and say we want to maintain a velocity then also we
can see that which area is sufficient say discharge is given, we know the discharge
by area will also give us the velocity. So, from that point also we can roughly see that
our area should be this much or that way also we can decide.Now, area is suppose fixed,
then how we canmaximize this Q value. For the given area we can maximize the Q value,
our required discharge for a given S B, for a fix A and then our required discharge can
be maximized by minimizing the perimeter, by minimizing the perimeter, so that is what
our basic concept.And now, we know that sayperimeter minimization how we can get, say perimeter
expression if we write, suppose for rectangular channel, say let us say for rectangular channel,
for rectangular channel this is say B bed width and then this is what is depth y.Now,
perimeter is equal to weknow that B plus twice y, B plus twice y is the perimeter.Now,of
course, we want to minimize this P and for that we want to see that how we can express
B, because that our area is important at this point. So, we can see how we can express it
that area is equal to B into y, B into y. So, this implies that B we can express as
area by y, well, so B we can write as area by y now. So, P is equal to, P is equal tosay
we can write it as A by y plus twice y.Now, if we consider P, now we can consider P as
a function of rather y, because we are already considering that A we are targeting, that
A is fixed and then we are trying to find P as a function of y.
So, how we can have minimum P? If we do say d P d y equal to 0, then this will give us
the minimum perimeter, this expression will give us minimum perimeter. So, we can justwrite
that our expression was P is equal toP is equal to A by y plus twice y. Now, if we just
use that concept that d P d y is equal to 0 implies that a is fixed, so it is 1 by a,
so it will become a into say 1 by minus y square and plus 2 this is equal to 0. So,
this will implies that A by y square is equal to 2, A by y square is equal to 2.
Now, again, we know what a is, area is nothing but B into y, so just replacing that what
we can write, B y by y is equal to 2, that implies that if weB y by y square that was…,
so this and that will go, so B is equal to twice y. Earlier, we were just usingthe term
I was talking about, say our expression is formost efficient section or for most economic
section, our relation is that B is equal to twice y, that we were just saying, now we
have seen that. If we go by this particular concept for rectangular channel, we are getting
that B is equal to twice y is the expression for most economic section.
So, if possible blindly we can give B is equal to twice y, but blindly means if we give blindly
without considering the criteria that we have already discussed, the sediment deposition
or the practical constraint, it will not go to the side and just design it.Then while
going to the side for implementation, we may face lot of difficulties, so we need to design
the canal after looking into all the other aspects, but should try to provide the most
economic section and this is the condition for rectangular section.
And then we can see that for a most economic section that is also we call as a best hydraulic
section. For rectangular section now we can see what the value of say hydraulic radius
is, what is the value of hydraulic radius, becausewhy it is required? Say we can we require
the for calculating the discharge amount, we require the hydraulic radius also. So,
once we can have the hydraulic radius in terms of depth, then also we can do those calculations.
So, let us just see what is the value of hydraulic radius in most economic section that is R
is equal to A by P. And now we can write that area is equal to B into y and then perimeter
is equal to B plus twice y, but what this B is, what this B is, what this B is,this
for best hydraulic section. For best hydraulic section we havewe have R is equal to see in
place of B, now we can write twice y, because B is equal to twice y, B is equal to twice
y. So, we can write B into y into y, then twice y plus twice y, so this willlead to
twice y square by four y or this is equal to y by 2. So, R is equal to y by 2 that is
what the best hydraulic section and in best hydraulic section hydraulic radius can be
considered as R equal to y by two. Well, with this understanding of best hydraulic section,
now let us see whether this same concept or the same relation will remain valid for other
sort of channel well.
Let us discuss about trapezoidal section, let us discuss about trapezoidal section,
well. If we take a trapezoidal section of this sort, say this is j, side slope is z
and let us consider this to besymmetrical. Generally when it is manmade,we will generally
try to make symmetrical,of course in some case, in hills, we may go for unsymmetrical
also, in one side we have Slope, other side we do not have, then we may go forsuppose
I meana unsymmetrical channel also, it may require, but normally we try to go for a symmetrical
section.Say depth is y, well, now, in case of trapezoidal section, in case of trapezoidal
section, we can write that area is equal to say B plus z y into y, that expression we
already know and this will lead to this will lead to say B is equal to say A by y minus
A by y minus z y. That’s why we are getting thethat, that
way we are getting the expression for B. And then perimeter,perimeter is equal to you can
write B plus twice y root over 1 plus z square. Now, this can be written as P is equal to
in place of B we can write A by y minus z y, that means just writing the B value plus
twice y root over 1 plus z square.Now, if you just apply the same condition that for
best hydraulic section, best hydraulic sectiond P d y is equal to 0, that implies d P d y
is equal to we can write that is minus A by y square, I mean ydifferentiating. So, it
is an a we are considering as constant here, then this will be minus z and then plus 2
root over 1 plus z square. Well, so this is equal to 0 and this implies
that twice root over 1 plus z square, that expression I am writing with an intention
here in this side is equal to A by y square plus z.Now, we can again replace the value
of a, a we know that a is equal to B plus z y into y,ok.
So, what we can write, that is 2 root over 1 plus z square is equal to that was A by
y square, so in place of a we can write now this as B plus z y into y.If we just recall
this was a, so we are replacingby this by y square and plus z, so this way we are writing
this expression,fine.
And then, if we multiply this by y, if we multiply this by y, then let us see how we
can write, say twice y root over 1 plus z square, twice y root over 1 plus z square
is equal to this is already going and then it become B plus z y, B plus z y plus z into
y, B plus z y plus z into y or we can write this as say y root over 1 plus z square y
root over 1 plus z square is equal to half ofsay B plus twicez y B plus twice z y.
Now, if I draw the trapezoidal section here, if I draw the trapezoidal section here, this
is leading us to one important aspect, say this width is B, fine, this side slope is
z, already explained, nowthis height is y, this depth is y, this depth is y, fine. So,
what about thisside? Say from here to here this is z y, now so what is the length of
this side? What is the length of this side, if this is y, this is z y, then it will be
root over, that is simply applying this square plus that square is equal to the diagonal,
two perpendicular sides. So, this is,this length is nothing but y squareplus say z y
z square y square root over…, so we can write this as y root over 1 plus z square,
so this part is giving us the side length. And then we know that this part is B and this
is again z y, this is again z y, so what is half of B plus twice z y, B plus twice z y
is nothing but the top width t. So, half of B plus twice z y is nothing but say half of
the top width, means from here to here, so this length is equal to depth length and this
is what the condition for best hydraulic section, we can write that length ofinclined sideis
equal tohalf of the top width. So, that way this is leading us to this condition, so if
a trapezoidal channel we want to make most economy,we will have to design it by following
this concept, again we should not forget that there may be lot of practical consideration
which may not allow us to have this sort of best hydraulic section.
Well, we have discussed aboutthe design concept of unlined, no, lined canal, we have discussed
about the design concept of lined canal. And of course, discussed some of the fundamental
aspect of say unlined canal also,and but we are yet to cover that if that channel is suppose
it is a lined canal, but it is a triangular, it is circular, what will happen how we will
design that part, so that we will be discussing in the next class. And then along with that
we will be starting our discussion on unlined canal as well;thank you very much.