Tip:
Highlight text to annotate it
X
TRA Snow and Sun
Drop a chalk line on the roof 12" from the eave.
Count number of Clamps per 10' length and slide them onto the pipe.
If at the start or end of a (50' max) fence section place a Collar on the inside of the
first/last Clamp.
Position Clamps on chalk line ensuring the teeth of the Clamps are on the open side of
the seam.
Locate Clamps on the seams and tighten the Clamps just enough to prevent movement.
Ensure the Clamps are true to the chalk line and using a calibrated torque wrench torque
all bolts 30 ft-lbs.
The Pipe should not extend more than 6" past the last Clamp. Upon terminating if necessary,
cut off access Pipe and seal cut end with weather proof sealant to prevent corrosion.
Slide the Collar to fit snugly against the first or last Clamp and torque set screw to
approx. 15 ft-lbs.
Install End Caps into Pipe ends, Caps should compression fit inside ends. Tap with a hammer
and remove any metal burrs or excess paint with metal file if necessary.
At every 10' section install a union to align and hold fence together.
TRA Snow and Sun Products will be warranted only if installed according to the engineered
specifications provided by TRA Snow and Sun. To obtain an official snow retention plan,
layout, installation detail, and additional instruction please contact us.